Shivam Pvt. Industrial Training Institute
(Affiliation to NCVT Ministry of skill development & Entrepreneurship Development Govt. of India)
Administered by Directorate of Technical Education Govt. of Rajasthan, Jodhpur (Rajasthan)
Updates
Welcome at our institution Website. For details you can make query under quick contact & contat us.

Electric Power Supply

POWER SUPPLY :

     (Note: Electrical Connection should be in the name of the ITI/Management/Owner of premises)

1.

Electrical Connection issued in the name of

Shivam Private Industrial Training Institute

2.

Electrical Connection issuing authority

AVVNL, Ajmer

3.

Date of connection

13/02/2014

4.

Whether three phase connection

Yes

5.

K. No. of the Connection

11040015

6.

Meter Seal No.

3986295

7.

Whether Diesel Generator Set Available?

If  Yes, its capacity,

Diesel Consumption and Payment

Yes, 7.5 KVA

 

Click Here

8.

Trade (Existing)

Maximum no. of units

 in one shift

Power supply required as per norms in KW

1. Electrician

04

10.4

Total electrical Load

10.4

Power supply available in the Institute in KW

15.0

 

(Note: The energy supplied by DG set is to be measured by installing Digital/Electronic meter at suitable location. This energy meter is to be which is to be sealed by the State Directorate Officers during inspection to avoid any tempering).

Enclosures :

(i)  For existing institutes: Electricity bill indicating connected load is required to be produced (details of existing trades, units should also form part of the inspection report to assess the required electrical load).

(ii)  For new institutes : Meter sealing report indicating sanctioned load or if meter sealing report does not have sanctioned load, copy of the sanctioned load, proof of payment of dues for the same along with meter sealing report should be produced/submitted.

(iii) Where the Institute is in the rented/leased building, the electric connection should be in the name of the owner of the institute/management and the mutual agreement between landlord and the Institute/ Management/ Society as the case may be, should be produced along with the current bill.

(iv)  Declaration by the owner of the Institute that the sanctioned load is for ITI only / shared with any other Institute.